Resources
LAVC has published several documents related to the college's Bond building projects. The following links provide more detailed information on its various Master Plans, its Environmental Impact Reports, and the LAVC Campus Design Standards.
- LAVC Educational and Facilities Master Plan 2002 (PDF) - 14 MB
- LAVC Facilities Master Plan Update 2003 (PDF) - 90.9 MB
- LAVC Facilities Master Plan Update 2010 (PDF) - 18.6 MB
- Environmental Impact Report 2003
- Cover (PDF)
- Executive Summary (PDF)
- Table of Contents (PDF)
- Summary (PDF)
- Summary Table (PDF)
- Chapter 1 – Introduction (PDF)
- Chapter 2 – Project Description (PDF)
- Chapter 3 – Environmental Settings, Impacts & Mitigation Measures (PDF)
- Chapter 4 – Alternatives (PDF)
- Chapter 5 – Impact Overview (PDF)
- Chapter 6 – Bibliography (PDF)
- Chapter 7 – Persons and Organizations Consulted (PDF)
- Chapter 8 – List of Preparers (PDF)
- Chapter 9 – Response to Comments on the Draft EIR (PDF)
- Appendices (PDF)
- Environmental Impact Report - 2006 Addendum Memo
- Environmental Impact Report - 2011 Addendum & Comments
- Exterior Lighting Master Plan (PDF) - 27.9 MB
- Measure J - Stormwater Master Plan (PDF) - 16.7 MB
- Measure J - Utility Master Plan (PDF) - 43.4 MB
- LAVC Urban Forest Master Plan 2011 (PDF) - 80.8 MB
- Arborist Inventory (PDF)
- Map of Urban Forest (PDF)
- Campus Design Standards - Cover (PDF)
- Table of Contents (PDF)
- About Campus Standard (PDF)
- Design Criteria / Requirements (ZIP) - 13.8 MB
- Division 2 - Site Work (ZIP)
- Division 3 - Concrete (ZIP)
- Division 4 - Masonry (ZIP)
- Division 5 - Metals (ZIP)
- Division 6 - Woods & Plastics (ZIP)
- Division 7 - Thermal & Moisture Protection (ZIP)
- Division 8 - Doors & Windows (ZIP)
- Division 9 - Finishes (ZIP)
- Division 10 - Specialties (ZIP)
- Division 11 - Equipment (ZIP)
- Division 12 - Furnishings (ZIP)
- Division 14 - Conveying System (ZIP)
- Division 15 - Mechanical (ZIP)
- Division 16 - Electrical (ZIP)